FG takes delivery of two standard gauge locomotives from China - Uju Ayalogu's Blog for News, Reviews, Articles and More

Breaking News

Post Top Ad

Thursday 27 July 2017

FG takes delivery of two standard gauge locomotives from China

FG takes delivery of two standard gauge locomotives from China

THE Federal Government on Thursday took delivery of two double-end-drivers-cabin Standard gauge locomotives engines from the Peoples Republic of China.

The Hon Minister of Transportation, Rotimi Amaechi, who was on hand to take delivery of the two locomotives, which were discharged at the ENL Terminal of the Lagos Ports Complex (LPC), explained that the two locomotives are part of a 20 locomotives engines expected to arrive the country for the commencement of standard gauge rail operations in Nigeria.

Representing the Hon Minister of Transportation, Managing Director of the Nigerian Railway Corporation (NRC), Engr Fidet Okhiria, stated that ten more locomotives are expected to arrive the country by September.

According to the NRC MD, “these two locomotives are specifically designed for passenger train movement. This locomotive have inbuilt power supply. This is unprecedented. It is designed for 150km per hour rail services and it is double-end driver’s cabin.

For More:Visit Us at Uju Ayalogu's Blog

What this means is that on both ends of the locomotive, there is a drivers cabin. What we used to have is a locomotive with only one driver’s cabin on one side. “

On the 20 locomotives expected into the country, the NRC MD explained that, “these two locomotives were ordered in 2014. The 10 locomotives that we ordered in Aril, 2017, the company manufacturing them has asked that we come for factory acceptance test.

We hope that by September, these ten coaches will arrive the country. The government just approved another seven locomotives, and we are in the process of raising letters of credit for those ones.

“With these two new additions, we intend to increase our return trips because the new locomotives will be running at a speed of 130km per hour as against the 90km per hour we are currently doing.

“The locomotives will be put to use for the Nigerian standard gauge rail project, although for now, we are only doing the Kaduna-Abuja standard gauge rail.”

Are you an artiste? Do you want your music to go viral and reach a large number of audience? Promote your music and Submit your story  on Ujuayalogusblog.com by clicking here. For Advert Inquiries Tel/+44(0)7590363984 Subscribe to Ujuayalogusblog.com News!

ALL RIGHTS RESERVED. 2015-2017 @ Uju Ayalogu's Blog NIGERIAN NEWS
For More:Visit Us at Uju Ayalogu's Blog



Subscribe to Our Posts via Email


Share This

No comments:

Post a Comment

Listen to This Beautiful New Talent - Winter Wolf - Singing "Midnight"


Post Bottom Ad

Pages